There will be a meeting again on Tuesday May 6, 7pm, in Suite 301, to discuss window repair/replacement quotes that Tom Heise is getting.
Next Meeting: Tuesday May 6, 7pm, in Suite 301
April 21st, 2008New Strata Documents Added
February 8th, 2008We have created a new section on the site called Strata Documents. Visit here to find important documents related to the building and strata. If you have important documents, please email them as an attachment to our webmaster Stacey to be posted.
Next meeting: Jan 30 2008 at 7 pm
September 13th, 2007The next meeting – Our Annual General Meeting – will take place in Peggy’s suite at 7pm, Wednesday January 28 2008.
Strata Wish List
July 12th, 2007If you have ideas about how to improve our building, please post them here.
Current wish-list items are
- New carpet in hallways
- Painting of hallways
- Replacing all windows
- Putting a more attractive fence on the east side of the building
- Creating windows with fireglass in the hallway doors to allow natural light into the hallways
- Laundry room and bike room maintenance paint floor and walls to brighten up area
- Replace water pipes in building
Next meeting: Sept 12 2007 at 7 pm
July 12th, 2007The next meeting will take place in Peggy’s suite at 7pm, Wednesday September 12.
You can find the last meeting’s minutes here.
March 28 2007: Our new boiler is installed!
March 28th, 2007The new energy efficient boiler system is in full operation. It has been for a couple of days now. This Thursday and Friday, the old boiler will be broken down and then removed.
Tom and Josué will be painting the walls once Reid Brothers ( our contractors) are done.
Old boiler, out of operation
New boiler, in operation
New boiler’s easy to read digital monitor screen
New hot water heater (large) and expansion (small)
Asbestos removal
New Boiler Progress
March 18th, 2007For those of you who may be interested, here are photos from the first 2 days of the new boiler installation. Keep checking back for updates!
Beginning stages of new boiler installation, Day 1
Old hot water heater, Day 1. Eventually, the old water heater will be replaced.
Close-up of new air vent
Boiler, Day 2
Revised Quotes – Q&A
February 25th, 2007- >> answers PDF
- >> asbestos removal PDF
- >> ibc, PDF
Boiler Tour
February 25th, 2007
Tom and Josue met with Don Peladeau from Reid Brothers a second time for a question and answer session with him.
They went on a brief tour of a nearby apartment that had a recent installation of the boiler and hot water tank that we will be using. The above photo is of the water tank.
The Boiler
Close Up of Boiler
Pictures from meeting
February 1st, 2007The next strata meeting will be Mon Feb 26.
Richard, Barbara and Peggy weigh in on replacing the boiler
Merry, Surinder and Tom